top of page

2021-2022, “51-53 West Street
Brighton, BN1 2RA (UK)
Conversion - RIBA stage 3/Planning
Cost: > £ 1.2 M
The proposal consist in three separate applications, all granted - Prior Approval for a change of use of the first, second and third floors and part of the basement from office (E) to residential (C3) to provide 12no. flats. - Replacement of existing upper floor windows with timber sashes, including new first floor window openings to west elevation, and installation of new shopfront. - Creation of an additional storey to provide 2no. one-bed flats and 1no. studio flat (C3), with roof terrace.
Project Gallery






bottom of page